Electro Mcnichael

Order Details;

Shipboard
Management
for
ETO
Repeat
Assessment
3
Assessment
Title
Steering
Gear
Assessment
Subtitle
PM
on
No.2
Starboard
Main
Hydraulic
Pump
Motor
Assessment
Scenario
You
are
the
ETO
on
an
oil
tanker,
the
preventative
maintenance
system
requires
that
routine
maintenance
be
carried
out
on
the
No.2
Starboard
Main
Hydraulic
Pump
Motor
and
Starter
system.
Issue: 1 2.11 Steering Gear Page 3 of 6
M
M
No 2 Pump Unit M
Stbd
Over Pressure
Protection
265 Bar
Over Pressure
Protection
265 Bar
TS
TS
Header Tank with
Safematic Float Alarms
M
No 1 Pump Unit M
Port
TS
Key
Hydraulic Oil
Power Lines for
No.1 Pump’s CCT
Power Lines for
No.2 Pump’s CCT
Air
*P
*X2
*X1
T
Storage Tank
B
A
P
T
DP
PS
C3 C4
P4
P2
P3
P1
C1 C2
50
bar
Safematic Block
Y2
S0
S2
S1
S4 S3
Y1
Air Driven
Oil Transfer
Pump
3 4
1 2
U1
L
SL
SL
LL
Pilot Valve
Variable Stroke Axial Pump
Differential Pressure Alarm
Bypass Relief Valve
Filter
Illustration 2.11b Steering Gear Fluid Flow
Oil-air
Cooler
LL
High
Temp.
Oil air
cooler
Servo Relief
valve
35 Bar
*P
*X2
*X1
DP PS
50
bar
Pilot Valve
Proportional Control
Valve Block
Adjustment Cylinder
Variable Stroke Axial Pump
Proportional Control
Valve Block
Low level
Safematic Low level
Safematic Low level
Low Low level Low Low level
Document Title: Machinery Operating Manual
Document Section 2: British Progress
Revision: 1
Date: October 2000
Report
The
report
should
be
no
more
than
4
pages
in
length
(you
should
include
drawings
and
diagrams
to
support
your
work
though
these
will
not
be
counted
towards
your
4
pages)
and
written
from
the
viewpoint
of
an
ETO.
The
report
should
be
based
on
what
you
learned
in
class
and
any
research
you
may
have
done
for
the
report.
Plagiarism
or
copying
information
even
with
citation
will
not
be
acceptable
expectable
in
the
case
of
pictures,
drawings
or
diagrams.
Marks
will
be
awarded
as
follows;
! Professional
layout
(10%)
! Introduction
(10%)
! Main
body
(70%
broken
down
as
follows)
o Background
information
on
the
system
(15%)
o Safe
working
practices
and
Marine
environment
anti-­‐pollution
measures,
Operational
and
Maintenance
procedures
(30%)
o Legislation,
maintenance
regulations,
ISM
and
MARPOL.
How
will
these
affect
this
task
(10%)
o Project
Management
with
regard
to
managing
time
and
personnel
in
this
task
(15%)
! Conclusion
(10%)
Topics
(possible
considerations
for
the
report)
Overview
! System
o Steering
systems
o Preventative
maintenance
on
a
motor/starter
system
! Technical
Detail
! Drawings
and
diagrams
! Example
manuals
Safety
Considerations
! Are
there
any
dangers
associated
with
system
! What
PPE
&
test
equipment
is
needed?
! Are
any
special
permits
required
to
use
the
equipment
! Permits
to
work
! Risk
assessment
! Legislation
o ISM
o MARPOL
o SOLAS
! Regulations
o Electrical
safety
regulations
o Electrical
maintenance/installation
regulations
o Flag
state
reporting
requirements
o Company
regulations
! Project
Management
o Time
o People
o Spares
requirement
o Record
keeping
Submission
date:
08/05/15
4.4.2 The submission dates or dates of occurrence of elements of coursework assessment
must be made available to candidates at the start of the module delivery. Any
subsequent changes to the notified dates should be communicated to the candidates at
the earliest possible opportunity.
Coursework which is submitted after the submission date will attract a penalty as
follows:
-Up to 1 calendar week delay 10% of the marks available for the assessment
-Up to 2 calendar weeks delay 20% of the marks available for the assessment
-Over 2 calendar weeks delay 100% of the marks available for the assessment